Industrial Engineering Toolkit

Your engineering workspace.

Practical tools for industrial engineers, from unit conversions to production performance.

Tools
04 of 04
Categories
05
Units
34

Tool 01 · Preview

ConvertLab

Available
km
— mi

1 km = 0.621371 mi

Fig. 00 — km / mi scale comparison
Open full converter

Sec. 01 — Tool directory

Modules

All four tools are available, built on the same foundation.

Tool 01 Available

ConvertLab

Unit converter for length, mass, pressure, energy and temperature.

Tool 02 Available

Production Efficiency & OEE

Availability, performance and quality combined into overall equipment effectiveness.

Tool 03 Available

Inventory Management

Order quantities, reorder points and safety stock with worked results.

Tool 04 Available

Capacity Planning

Utilization, efficiency and bottleneck analysis for a serial production line.

Sec. 02 — Tool 01

ConvertLab

Pick a category, enter a value, and the result updates as you type.

—

Sec. 03 — Tool 02

Production Efficiency & OEE

Enter the figures for one production run to see availability, performance, quality and OEE.

Production inputs

min

min

min/unit

units

units

Overall equipment effectiveness

— OEE

Availability × Performance × Quality

Availability

—

Performance

—

Quality

—

Operating time
— min
Good units
— units

Performance analysis

These suggestions are general guidance, not a definitive diagnosis.

Sec. 04 — Tool 03

Inventory Management

Work out how much to order, when to reorder and what it costs per year for one stocked item.

Ordering
units/yr

currency/order

currency/unit/year

units

Leave blank to use the EOQ.

Replenishment
units/day

days

units/day

Economic order quantity

EOQ

— units

Total relevant annual cost

—

Safety stock

SS

— units

Reorder point

ROP

— units

Cost breakdown

Annual ordering cost
—
Annual holding cost
—

Purchase cost of the items is excluded: it does not change with the order quantity. Costs are in the currency you entered.

Supporting calculations

Orders per year
—
Days between orders (365-day year)
—
Average cycle stock (Q/2)
—
Demand during lead time (d × L)
—
z-score
—
Operating days implied (D ÷ d)
—

Rounding

Safety stock and reorder point are rounded up to whole units: rounding down would give less protection than the chosen service level. EOQ is rounded to the nearest whole unit; total cost changes very little near the optimum, so a convenient pack size close to the EOQ is fine.

Assumptions

  • Daily demand is roughly normally distributed and independent from day to day.
  • Lead time is constant; only demand varies.
  • Service level is the probability of not running out during one replenishment cycle, not the share of demand filled.
  • EOQ assumes steady demand, fixed ordering and holding costs, and no quantity discounts.

Sec. 05 — Tool 04

Capacity Planning

Measure how much of your capacity is used, and find the station that limits a serial production line.

Capacity

All three figures must cover the same period.

units/shift

units/shift

units/shift

Stations

    Utilization

    —

    Efficiency

    —

    Capacity summary

    Design capacity
    — units/shift
    Effective capacity
    — units/shift
    Actual output
    — units/shift
    Unused design capacity
    — units/shift
    Planned allowance (design − effective)
    — units/shift

    Bottleneck station

    —

    Maximum theoretical line throughput

    — units/hour

    Station capacity comparison

      Insights

        Assumptions

        This is a simplified theoretical model. Real lines lose capacity to stoppages, changeovers and variation, so actual throughput will be lower.

        • One product type.
        • Serial production line: every unit passes through every station in order.
        • Identical parallel machines within each station.
        • No breakdowns or setup losses.
        • No material shortages.
        • No rework loops.
        • All stations operate for the same period.

        Sec. 06 — Plans

        Pricing

        Demonstration only. These plans are examples. No payments or subscriptions are available.

        Student

        $0/month

        For coursework and labs.

        • All four tools
        • English and Turkish, light and dark themes
        • Works in any modern browser